INTERNAL DOOR INSTALLATION GUIDE

Installation
Remove door from pallet and place in location to be fitted.
Remove retaining screw from door spacer (located in bottom of door set)
Remove door spacer tapping off with a hammer.
Position door set in aperture.
Open door from sub frame to 90 degreeā€™s
Drill 5 number 6mm diameter clearance holes to each jamb starting 100mm down from the head then 460mm spaces in between.
Level sub frame head with a spirit level.
Plumb hinged jamb of sub frame with spirit level or plumb bob.
Fix in place and pack where necessary.
Close door and align meeting jamb for plumb and parallel to obtain an even 3mm gap.
Open door leaf, fix in place and pack where necessary.
Remove doorstops from packaging.
Close the door until the tongue of the latch engages with the strike plate. Push the door towards the open position until resistance is felt. Pin door stops to underside of head and two jambs. (Stops are pre-cut to size.) Be certain to leave a 1.5mm gap between doorstop and door face on hinge side of the door. This will stop the door leaf binding with the edge of the doorstop when opening and closing.
Remove lever handles from packaging and insert spindle in latch spindle hole. (Pre drilled) Locate lever handles onto spindle and fix in accordance with manufactures instructions.
Remove architrave from packaging and lay one set (two legs and a head) face down on a protected surface. Locate the plastic joining clip into the head and leg sections creating a complete set for one side of lining. Offer up to lining and pin every 400mm or stick with panel adhesive.

Maintenance
Both door and frame may be wiped over with a damp cloth. DO NOT use anything abrasive as this will result in scratching the surface.
Light oil may be applied to hinges if necessary.